© 2024 Public Radio Tulsa
800 South Tucker Drive
Tulsa, OK 74104
(918) 631-2577

A listener-supported service of The University of Tulsa
classical 88.7 | public radio 89.5
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Ground is Broken for New TCC Facility

TCC

The Tulsa Community College breaks ground on a new $5.3 million expansion at its Southeast Campus. The facility is being paid for with funding from the 2016 Vision Tax extension, approved by voters.

The facility will become the TCC Student Success and Career Center. TCC President, Dr. Leigh Goodson, says the facility will be a one-stop location for all student services. The construction is expected to take about a year.

While located at the 81st and Highway 169 campus, President Goodson says the facility will serve all four TCC campuses.