© 2024 Public Radio Tulsa
800 South Tucker Drive
Tulsa, OK 74104
(918) 631-2577

A listener-supported service of The University of Tulsa
classical 88.7 | public radio 89.5
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Corps Monitors Lake Levels... Again

File Photo- US Armys Corps of Engineers

The Tulsa District of the U.S. Army Corps of Engineers is paying close attention to lake levels ahead of next weekend's Memorial Day Holiday. The holiday is the tradition start of the lake season.

Last week's rain forced up lake levels and the Corps is decide how much to release from dams.

Here are the flood pool levels and water release rates  as of 8 a.m. Sunday:

Fort Gibson:  Flood pool is 84% full. Releasing no water at this time.

Grand Lake: Flood pool is 90% full. Releasing water from the dam at 25,000 CFS

Hudson: Flood pool is 94% full. Releasing water from the dam at 45,000 CFS

Keystone: Flood pool is 66% full. Releasing water from the dam at 687 CFS

Skiatook: Flood pool is 59% full. Releasing no water at this time.

Ten Killer: Flood pool is 38% full. Releasing no water at this time.